Pipe Filling Example Job

Nichols/GROUT TECH was contacted to fill the annulus space between the existing 66” concrete, and new 44” HDPE, pipes, for an approximate 600 feet. Due to each end of the newly inserted HDPE pipe being approximately 100 feet from each end of the existing concrete pipe, a special bulkhead had to be designed; one that would withstand the pressures of approximately 150 cubic yards of cement placed against them, under pressure.

Injection End

Exit End